Testing and Preparing Subfloors
-
Products
- Removal of Floor Coverings
- Subfloor Treatment
- Testing and Preparing Subfloors
- Laying of Floor Coverings
- Installation and Sanding of Parquet Floors
- Transportation
- Work Protection & Work Clothing
- Cleaning & Protecting of Floor Coverings
- Accessories
- New Products 2026
- Gebrauchtmaschinen
- Sommeraktion 2026
- Seminars
- Brands & Subjects
- About us
- Contact
Before starting the flooring installation, the subfloor must be dry and levelled. To determine the residual moisture of screeds, we offer various measuring devices - from the classic CM method, different electronic measuring methods to the modern KLR method with Bluetooth connectivity. Combination devices cover a wide range of different measuring tasks, including determining air humidity, room temperature, and wood moisture. For creating a levelled subfloor, you will find all the machines and tools for priming the subfloors, mixing leveling compounds - from small hand mixers to large mixing stations - and finally all the necessary trowels and squeegees.
Our categories